Project Overview
Following the installation of a new roadside safety barrier and security fencing, reinstatement works were undertaken to restore the surrounding carriageway, verge and drainage infrastructure. The project ensured the affected areas were returned to a safe, durable and operational condition while maintaining access throughout the works.
Project Requirements
- Reinstate road edges and verges disturbed during barrier and fence installation.
- Restore drainage channels and adjacent hardstanding.
- Reinstate the carriageway using suitable sub-base and asphalt materials.
- Deliver a finish that complied with project specifications and industry standards.
What We Delivered
- Excavation, preparation and regrading of affected areas.
- Installation and compaction of new sub-base materials.
- Asphalt reinstatement to tie into the existing carriageway.
- Reinstatement at drainage channels and road edge details.
Outcome
The reinstatement works successfully restored the road and surrounding infrastructure, providing a durable, high-quality finish that blended with the existing surfaces. The completed works ensured continued safe vehicle access, protected the newly installed barrier and fencing, and met the required engineering and safety standards.