Project Overview
Tarmacadams carried out utility reinstatement works across multiple locations in Glasgow following infrastructure and utility installation works, ensuring affected surfaces were restored to a high standard.
Project Requirements
The project required the reinstatement of excavated carriageways, footpaths and access points following utility works, with minimal disruption and compliance with industry reinstatement specifications.
What We Delivered
- Preparation of reinstatement areas following utility excavations
- Supply and laying of asphalt concrete base course
- Installation of asphalt surface course to required specifications
- Reinstatement of roadways, footpaths and access routes
- Surface finishing and compaction to ensure long-term durability
Outcome
The completed reinstatement works restored the affected areas to a safe and serviceable condition, providing durable surfaces capable of withstanding regular traffic and pedestrian use. The project was completed efficiently and in accordance with required reinstatement standards.