Project Overview
Groundworks and resurfacing improvements completed at a waste recycling centre in Balloch.
Project Requirements
The site required excavation, regrading and resurfacing works to improve operational access and simplify future maintenance.
What We Delivered
- Excavation of existing muck bankings
- Regrading and preparation of sub-base
- Installation of asphalt concrete base and surface course
- Supply and laying of drainage chips to pathway areas
Outcome
The improved site layout now offers better surface performance, improved drainage and easier ongoing maintenance for operational staff.